• 1997-2004, Mersin University Ciftlikkoy Campus Construction of infrastructure facilities consisting of 1.000 + 1.600 + 1.000 kVA transformer, energy transmission lines and 8 generator systems

  • 998-2002, Mersin University Faculty of Medicine. Construction of substation facilities consisting of (old) 1.600 + 1.600 kVA transformer, 1.600 + 560 kVA generator and Energy Transmission lines

  • 2011, Mersin University Medical Faculty Hospital (Çiftlikköy) Energy Supply and Substation Construction; From the Turkish Electric Authority’s Mersin 2 154 kV Substation, to Hospital Substation 8.5 km underground Power Transmission Line with 36 kV 4 (1x400 mm2) XLPE Cable. 20MVA (10*2 MVA) substation turnkey construction was carried out by our team.